You must be a CTBUH Member to view this resource.
Ocean Heights
Building
Completed
2010
Residential
All-Concrete
310 m / 1,017 ft
83
3
519
582
6
113,416 m² / 1,220,800 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
18 August 2016 - CTBUH Research
09 May 2013
Mimi Daraphet, Meinhardt Facade
Façades simply taken in isolation can be complex. A combination of design, engineering, fabrication and installation expertise is important to address all aspects of façade...
Ocean Heights is located in the Dubai Marina development, making an immediate visual impact through a combination of soaring height and the geometry of its form. The building immediately starts to twist its three faces at the base. As it rises, the tower’s floor plates reduce in size, allowing the rotation to become even more pronounced. The building rises over its neighbors. This movement allows two faces of the building unobstructed views of the ocean. The tower breaks away from the orthogonal grid and reorients the project toward one of Dubai’s Palm Islands to the north.
A challenging aspect of the design was accommodating the client’s strict requirement of unit layouts within a challenging envelope. What resulted was a rational 4m (13ft) module, which tracks its way down through the entire building and only changes at the façade. This also considerably simplified the structural system of the project. The shear walls were placed perpendicular to the mean of the two most extreme angles of the façade. This was done to soften the relationship between façade and partitions minimizing how “off-perpendicular” the relationship becomes.
09 May 2013
Mimi Daraphet, Meinhardt Facade
Façades simply taken in isolation can be complex. A combination of design, engineering, fabrication and installation expertise is important to address all aspects of façade...
31 December 2010
CTBUH Research
In a year dominated by news coverage of the new “World’s Tallest Building” – Burj Khalifa, Dubai – one may be surprised to learn that,...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy