You must be a CTBUH Member to view this resource.
Cedar High Apartments
The Cedars
Building
Completed
1970
Residential
78.4 m / 257 ft
25
191
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
27 November 2019
Five people died in the early morning of 27 November 2019 in a fire on the 14th floor of a Minneapolis public-housing high rise, with...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy