You must be a CTBUH Member to view this resource.
David Whitney Building
Aloft Detroit at The David Whitney
Building
Completed
1916
Hotel / Residential
Office
All-Steel
82.9 m / 272 ft
19
105
136
Construction Start
Completed
Retrofit Start
Retrofit End
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
18 February 2019
Detroit has a buyer for a 17-story, severely dilapidated high-rise that the city hopes to see restored. Lee Plaza could be sold to Detroit-based Roxbury...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy