Carrier Johnson Architects

Renamed to Carrier Johnson + Culture

Carrier Johnson Architects

Buildings

Note: All listed data for proposed or under construction buildings is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.

  Completed   Architecturally Topped Out   Structurally Topped Out   Under Construction   On Hold   Never Completed   Proposed   Vision   Demolished
ID #   Status Building Name City Height (m) Height (ft) Floors Completion Material Use
9552 1   OH One Broadway Plaza Santa Ana (US) 150.3 493 37 - residential / office
20369 2   PRO 7th & Market San Diego (US) 144.2 473 39 2023 hotel / residential / office / retail
12774 3   COM First Allied Plaza San Diego (US) 125.6 412 23 2005 steel residential / office
20370 4   UC Park & Market San Diego (US) 109.7 360 34 2020 residential / office / residential
20547 5   COM Comerica Bank Building San Diego (US) 103.3 339 24 1974 office
20545 6   COM Wells Fargo Plaza San Diego (US) 100.9 331 23 1984 office
30417 7   COM Shift San Diego (US) 77.1 253 21 2018 concrete residential