Filter by
You must be a CTBUH Member to view this resource.
1 Undershaft
The Shaft, No. 1 Undershaft; Trellis
Building
Canceled
Office
All-Steel
289.9 m / 951 ft
73
3
17
7 m/s
154,100 m² / 1,658,719 ft²
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
29 January 2018 - Event
29 January 2018 | London
The London Committee of the CTBUH United Kingdom Chapter recently hosted [i]Geometry of Tall Buildings[/i], a conversation between leading architects and engineers on the geometry...
17 October 2016
Eric Parry, Nick Jackson & Tanya Parkin, Eric Parry Architects
The paper will describe the aims underpinning the proposed development at 1 Undershaft in the City of London. The project will be exemplary in putting...
27 November 2019
London’s future second-tallest building, 1 Undershaft, has been given the go-ahead after a three-year battle. The 951-foot (290-meter) skyscraper, nicknamed “The Trellis,” will be topped...
29 January 2018 | London
The London Committee of the CTBUH United Kingdom Chapter recently hosted [i]Geometry of Tall Buildings[/i], a conversation between leading architects and engineers on the geometry...
17 October 2016 | London
Eric Parry of Eric Parry Architects is interviewed by Chris Bentley during the 2016 CTBUH China Conference. Eric discusses the design process of 1 Undershaft...
27 November 2019
London’s future second-tallest building, 1 Undershaft, has been given the go-ahead after a three-year battle. The 951-foot (290-meter) skyscraper, nicknamed “The Trellis,” will be topped...
06 August 2019
Asian developer Perennial Real Estate Holdings has dealt a blow to Eric Parry Architects’ approved plans to build the tallest building in the City of...
27 March 2019
City of London planning officers have recommended approval for Foster + Partners’ opinion-splitting Tulip on a site next to the Gherkin. The planned 305-meter-tall tourist...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy