You must be a CTBUH Member to view this resource.
Al Rostamani Maze Tower
Latifa Tower
Building
Completed
2010
Residential / Office
All-Concrete
210 m / 689 ft
57
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
20 October 2018
Elena M. Generalova & Viktor P. Generalov, Samara State Technical University
This study discusses the current typologies of high-rise housing prevalent in Dubai. The uniqueness, trends and prospects of Dubai tall, residential development are analyzed. The...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy