AquaVetro Tower
Building
Under Construction
2023
Office
All-Concrete
88 m / 289 ft
23
2
20,000 m² / 215,278 ft²
Proposed
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
13 January 2022
CTBUH has just received confirmation that a 22-story mixed-use building located in Dublin, is now under construction. The project, which was initially greenlit in April...
13 January 2022
CTBUH has just received confirmation that a 22-story mixed-use building located in Dublin, is now under construction. The project, which was initially greenlit in April...
08 April 2019
Developer Johnny Ronan has won approval to build what may become central Dublin’s tallest building. The long-running saga to build the 22-story tower on Tara...