You must be a CTBUH Member to view this resource.
Ascent South Lake Union
Marlowe Apartments, 425 Fairvew Avenue
Building
Completed
2018
Residential
All-Concrete
83.8 m / 275 ft
25
4
251
7
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
05 November 2019
Ascent South Lake Union, Seattle's newest urban residential building by national multifamily developer Greystar, has completed construction and begun welcoming its first residents to the...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy