You must be a CTBUH Member to view this resource.
Battersea Roof Gardens
Art'oel London Battersea Power Station, Battersea Power Station Redevelopment Phase 3
Building
Completed
2022
Residential / Hotel
All-Concrete
64 m / 210 ft
17
3
617
164
Proposed
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
15 June 2022
Images of London's first art'otel have today been unveiled ahead of its opening at Battersea Power Station later in 2022. Spanish artist and designer, Jaime Hayon,...
Evolving into a multifaceted destination encompassing retail, residential, office, and cultural that includes unique attractions like the chimney lift the project reuses existing structures and has a light-touch approach and circular economy principles. With significant public spaces, transportation links, and a location for hosting various events, it attracts visitors and residents and marks a significant phase in the ongoing master plan.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.