You must be a CTBUH Member to view this resource.
City Hyde Park
Building
Completed
2016
Residential / Retail
All-Concrete
LEED Certified BD+C: New Construction
52.4 m / 172 ft
14
2
180
360
10
1.78 m/s
18,541 m² / 199,574 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
27 October 2015 | Chicago
In this presentation we discuss the terms “exo-spatial design,” “solar carving,” and “bridging” as strategies for creating more socially connective tall buildings. As a typology,...
08 August 2017
Jeanne Gang, Studio Gang Architects
Having designed the 262-meter Aqua in Chicago, which completed in 2009, Jeanne Gang, principal and founder of Studio Gang Architects, received considerable attention for what...
City Hyde Park re-imagines the urban apartment building, bringing new options for living, recreation, and leisure to its full-block site—formerly a strip mall and under-used parking lot.
Located at a busy commercial intersection near Lake Michigan and adjacent to a commuter rail stop, it is designed as a pedestrian-friendly hub that has a positive impact on the greater urban evolution of its neighborhood.
Featuring indoor and outdoor amenities, the residential tower rises from the plinth, which supports an expansive green roof and is anchored by a grocery store. At street level, wider, improved sidewalks complement the building’s retail arcade and lobbies, contributing to a dynamic, walkable community scene.
The building’s facade emphasizes its structure with a playful array of stacked concrete panels forming columns, bays, sunshades, and balconies, offering multiple opportunities for residents to socialize, enjoy the outdoors, and connect to the surrounding neighborhood and city. The building’s balcony “stems” act as columns that take gravity loads to the ground. Platforms extend from the stems in phyllotactic patterns that allow oblique sight lines between neighbors, encouraging social connectivity through architecture.
08 August 2017
Jeanne Gang, Studio Gang Architects
Having designed the 262-meter Aqua in Chicago, which completed in 2009, Jeanne Gang, principal and founder of Studio Gang Architects, received considerable attention for what...
01 June 2016
Jeanne Gang, Studio Gang Architects
In this paper we discuss the terms “exo-spatial design,” “solar carving,” and “bridging” as strategies for creating more socially connective tall buildings. As a typology,...
26 October 2015
Jeanne Gang, Studio Gang Architects
In this paper we discuss the terms “exo-spatial design,” “solar carving,” and “bridging” as strategies for creating more socially connective tall buildings. As a typology,...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy