City Quays 3
Building
Architecturally Topped Out
2021
Office
Concrete-Steel Composite
70.3 m / 230 ft
16
23,226 m² / 250,003 ft²
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
28 May 2019
Farrans has secured a £50 million (US$55.8 million) contract to build the new City Quays 3 project on behalf of Belfast Harbor, the largest development...