Crystal Top Tower
Cheongna City International Tower, City Infinity Tower
Tower
Under Construction
2024
Observation
All-Steel
448 m / 1,470 ft
27
2
2000
29,272 m² / 315,081 ft²
Proposed
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
01 June 2014
Charles Wee, GDS Architects
In September 2013, GDS Architects received planning approval for the 450-meter, US$400 million Tower Infinity in Cheongna, South Korea, between Incheon International Airport and Seoul....