Global Financial Center Tower 1
Shenyang China
Height 453 m / 1,486 ft
Floors 0
Official Name

The current legal building name.

Global Financial Center Tower 1
Name of Complex

A complex is a group of buildings which are designed and built as pieces of a greater development.

Type

CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
On Hold
Country

The CTBUH follows the United Nations's definition of Country, and thus uses the lists and codes established by that organization.

City

The CTBUH follows the United Nations's definition of City, and thus uses the lists and codes established by that organization.

Address
Function

A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

office
Structural Material

Steel
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from steel. Note that a building of steel construction with a floor system of concrete planks or concrete slab on top of steel beams is still considered a “steel” structure as the concrete elements are not acting as the primary structure.

Reinforced Concrete
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from concrete which has been cast in place and utilizes steel reinforcement bars.

Precast Concrete
Both the main vertical/lateral structural elements and the floor spanning system are constructed from steel reinforced concrete which has been precast as individual components and assembled together on-site.

Mixed-Structure
Utilizes distinct systems (e.g. steel, concrete, timber), one on top of the other. For example, a steel/concrete indicates a steel structural system located on top of a concrete structural system, with the opposite true of concrete/steel.

Composite
A combination of materials (e.g. steel, concrete, timber) are used together in the main structural elements. Examples include buildings which utilize: steel columns with a floor system of reinforced concrete beams; a steel frame system with a concrete core; concrete-encased steel columns; concrete-filled steel tubes; etc. Where known, the CTBUH database breaks out the materials used in a composite building’s core, columns, and floor spanning separately.

composite
Core
Reinforced Concrete
Columns
Concrete Filled Steel
Floor Spanning
Steel
Height

Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

Architectural
453 m / 1,486 ft
To Tip
453 m / 1,486 ft
Floors Below Ground

The number of floors below ground should include all major floors located below the ground floor level.

5
Construction Schedule
2013

Proposed

2014

Construction Start

Developer
Baoneng Real Estate Development
Architect
Atkins
Shenzhen General Institute of Architectural Design and Research Co., Ltd
Structural Engineer
Shenzhen General Institute of Architectural Design and Research Co., Ltd
MEP Engineer
Parsons Brinckerhoff Consultants Private Limited
Shenzhen General Institute of Architectural Design and Research Co., Ltd
China Construction Third Engineering Bureau Co., Ltd.

Landscape

Botao Landscape

LEED

Environmental Market Solutions, Inc.

Vertical Transportation

Parsons Brinckerhoff Consultants Private Limited

Paint/Coating

Submit images or information about this project using the Data & Image Submission Portal