Note: As this project is under construction, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
Lot 4 Elizabeth Quay
Lot 4 The Esplanade
Building
Under Construction
2025
Residential / Office
212.4 m / 697 ft
54
2
176
264
22
69,352 m² / 746,499 ft²
Proposed
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
25 March 2021
Perth property doyen Adrian Fini and Malaysian Victor Goh have lodged plans for a 54-story mixed-use tower to add to Perth’s skyline as part of...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy