You must be a CTBUH Member to view this resource.
MaxHaus Alto da Boa Vista
MaxHaus Campo Belo, Campo Belo, Alto da Boa Vista
Building
Completed
2013
Residential
All-Concrete
62.4 m / 205 ft
20
68
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy