You must be a CTBUH Member to view this resource.
Piccadilly Central Tower
Building
Canceled
Residential / Hotel
188 m / 617 ft
60
430
220
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
26 April 2021
Plans for a skyscraper behind Piccadilly station dating back more than 15 years have finally ended after the site was sold to make way for...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy