Tallwood 1 at District 56
Building
Completed
2022
Residential
Steel-Timber Composite Over Concrete
41.7 m / 137 ft
12
2
15,977 m² / 171,975 ft²
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
24 May 2022 | Victoria
At a 12-story residential building, an eccentrically braced steel frame provides lateral support to the “flat-plate” CLT floorplates. The resilient lateral force-resisting system includes replaceable...
23 May 2022
CTBUH Research
This data study represents the significant recent momentum of the mass-timber movement worldwide. There are now 139 mass timber buildings around the world of eight...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy