You must be a CTBUH Member to view this resource.
Taman Anggrek VI
Building
Completed
1998
Residential
All-Concrete
151 m / 495 ft
46
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
20 September 2021
Ali Amiri & Neshat Sakeena, Ramboll Middle East
The built environment sector is responsible for some 39 percent of global carbon emissions. Therefore, decarbonizing the building industry is one of the most effective...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy