You must be a CTBUH Member to view this resource.
The Troika Tower 3
The Troika Tower C
Building
Completed
2010
Residential
All-Concrete
204 m / 669 ft
50
4
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
The project comprises three apartment towers which together form the tallest residential development in Malaysia. At ground level, a four-story perimeter commercial building contains offices, shops and cafés, and frames a landscaped courtyard. Entirely free from cars, the courtyard forms the heart of the development—a tranquil urban oasis. Residents enter through the courtyard via a grand entrance, which leads to lift banks on individual floors that are shared by two apartments each. The podium roof also provides a variety of recreational facilities.
The unusual external structure consists of a number of slender concrete shear walls, which support a series of stacked blocks that are able to rotate subtly to allow the primary living areas and balconies in each of the apartments to focus on the best available view. The arrangement of the shear walls allows a wide variety of plan sizes. Many areas are self-shaded by the projecting shear walls and overhang of the apartment above, which provides shelter to the balconies. Skybridges link the towers at level 24 creating a communal sky lobby.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy