Torre Diagonal ZeroZero
Diagonal ZeroZero, Torre Telefónica Diagonal ZeroZero, Zero Zero Tower
Building
Completed
2011
Office
Concrete-Steel Composite
110 m / 361 ft
24
2
200
6
33,927 m² / 365,187 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Housing its main tenant, Telefónica España, the building is located by the sea at the origin of Barcelona’s main thoroughfare, Diagonal Avenue. The building takes the linearity of the street on the perimeter as the generator of its form creating a trapezoidal prism—sharp and stylized.
On the inner part of the façade, a series of very slender [16x16 cm (6x6 in) above the 13th floor, 16x32 cm (6x12.6 in) below] steel pillars 135 cm (53 in) apart carry the vertical loads and generate a screen to help diffuse light. An exterior rhomboidal lattice structure made of 24x68 cm (9.4x26.7 in) steel pipes supports all torsion and horizontal loads. The exterior lattice is not only a key structural element, but casts deep shadows on the façade thus reducing solar radiation. Vertical bands of white ceramic painted pattern cover 25% of the curtain wall. The style of the patterned bands was inspired by the salted spray that comes from the nearby sea. Visually the bands emphasize the slender form while further helping to control sunlight.