Filter by
You must be a CTBUH Member to view this resource.
Torre Reforma
Building
Completed
2016
Office
Concrete-Steel Composite
LEED Platinum BD+C: Core and Shell
246 m / 807 ft
56
9
1024
28
5 m/s
44,196 m² / 475,722 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
2016 CTBUH Awards
03 November 2016 | Mexico City
Benjamin Romano, Founding Principal, LBR&A Architectos, is interviewed by Chris Bentley regarding the Best Tall Building Featured Finalist, the Torre Reforma, Mexico City, during the...
17 September 2021
Will Miranda & Daniel Safarik, CTBUH
Some 97 cities worldwide, including most of the world’s megacities with a population of 10 million or more, have signed onto the C40 Cities Climate...
03 November 2016 | Mexico City
Benjamin Romano, Founding Principal, LBR&A Architectos, is interviewed by Chris Bentley regarding the Best Tall Building Featured Finalist, the Torre Reforma, Mexico City, during the...
03 November 2016 | Mexico City
Structural integrity, inventive design, and a nod to heritage converge to form the underpinnings of Torre Reforma’s unequivocal appearance. The tower’s composition rejects traditional notions...
23 October 2009 | Mexico City
As we emerge from the recession, the need to deliver buildings faster and cheaper will be a key requirement for re-energising the industry. More efficient...
17 September 2021
Will Miranda & Daniel Safarik, CTBUH
Some 97 cities worldwide, including most of the world’s megacities with a population of 10 million or more, have signed onto the C40 Cities Climate...
11 October 2019
CTBUH Research
The default image of the skyscraper for the past 50 years in the public imagination has likely been the extruded, rectilinear corporate “box,” derived from...
29 July 2019
Since humans first began constructing tall buildings, history has been cluttered with claims of all manner of “highest” records. In this study, we examine those...
01 February 2017
Julieta Boy, LBR&A Arquitectos
Torre Reforma is not only the tallest building in Mexico City, but is also representative of innovation and leadership in the high-rise building industry, which...
10 January 2017
Jason Gabel, Annan Shehadi, Shawn Ursini & Marshall Gerometta, CTBUH
CTBUH has determined that 128 buildings of 200 meters’ height or greater were completed around the world in 2016 – setting a new record for...
26 October 2015
Tom Wilcock, Marc Easton, William Algaard & Tabitha Tavolaro, Arup
In recent years Mexico City has seen a surge in tall building construction, concentrating around the new Central Business District on Paseo de la Reforma,...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy