You must be a CTBUH Member to view this resource.
Tour Altoria
Tour Air Canada, Tour Aimia, Air Canada Tower, Tour Viger
Building
Completed
2014
Residential / Office
All-Concrete
124 m / 407 ft
35
5
152
51,097 m² / 550,004 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
01 April 2022
Blackstone Real Estate acquired 1100 Atwater in Westmount and the Air Canada Tower in downtown Montreal for a transaction of over CA$230 million (US$183 million)....
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy