You must be a CTBUH Member to view this resource.
Museum Tower
Building
Completed
2013
Residential
All-Concrete
170.7 m / 560 ft
42
123
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
19 September 2012 | Dallas
This presentation examines the application of specially designed tuned sloshing dampers such as bi-directional and double-decker dampers to two very slender concrete towers currently under...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy