CTBUH Silver Member

BKV Group

About

Member Since: 2018

Member Offices: Minneapolis

Website: https://bkvgroup.com/

Fields of Expertise

Architecture; Engineering, Multi-discipline; Interior Design; Landscape Architecture

Membership details

Membership Level

Silver

Member Since

2018

Member Offices

  • Minneapolis

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

Custom House

83.5 m / 274 ft

2

Soo Line Building

79.6 m / 261 ft

3

The Standard at New Brunswick

68.5 m / 225 ft

4

1411 South Michigan Avenue

52.7 m / 173 ft

Building Completions Timeline

 

Global News

08 December 2020

Apartment Towers Pitched for South Loop, Near West Side in Chicago

COVID-19 has slowed Chicago’s economy, but two bullish developers have drawn up ambitious plans that would bring a combined 1,200 apartments to two city neighborhoods....

Statistics

Average Building Age*

64 Years

Most Common Function*

Mixed-use (67%), 2 Buildings

Most Common Material*

Steel (50%), 2 Buildings

* Based on 150 m+ buildings currently in the database.

Total: 3 Buildings for which a function has been assigned.
 
Total: 4 Buildings for which a material has been assigned.
 

*Based on 4 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.