Iconic Tower
Building
Completed
2024
Hotel / Residential / Office
Concrete-Steel Composite
393.8 m / 1,292 ft
77
1
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
22 August 2022
Tarek Hassan, Yehia El-Ezaby & Charles Malek, rector Dar Al Handasah Consultants (Shair and Partners)
This paper presents an overview of a process of optimizing concrete mixture for tall buildings, culminating in the design of the Iconic Tower, the key...
18 July 2022
The Iconic Tower in Egypt’s New Administrative Capital (NAC) completed construction of the concrete structure and finishing touches are now underway. It is one of...
18 July 2022
The Iconic Tower in Egypt’s New Administrative Capital (NAC) completed construction of the concrete structure and finishing touches are now underway. It is one of...
23 July 2021
The Iconic Tower in Egypt’s New Administrative Capital (NAC) completed construction of the concrete structure. It is one of 18 skyscrapers planned for NAC’s Central...
18 January 2021
The first office tower in Egypt's New Administrative Capital (NAC) has been completed, according to China State Construction Engineering Corporation (CSCEC). The C08 building, which...
17 March 2020
China State Construction Engineering Corporation (CSCEC) has finished the capping of the first skyscraper in the 20-tower business district that it is building in Egypt's...
21 January 2019
The foundations for what could become Africa’s tallest building, a 385-meter-tall tower in Egypt’s new administrative capital, will be poured within days, according to the...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policyWe are identifying potential improvements to the CTBUH Skyscraper Center database. The first step of this research is to understand the users of the database and what they are looking for. Please take a couple moments to share your feedback.
* Required