You must be a CTBUH Member to view this resource.
One Atlantic Center
IBM Tower
Building
Completed
1987
Office
Concrete-Steel Composite
ENERGY STAR Certified; LEED Gold O+M: Existing Buildings
249.9 m / 820 ft
50
102,073 m² / 1,098,705 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy