You must be a CTBUH Member to view this resource.
Opal Tower
Opal Tower at Sydney Olympic Park, Australia Towers D
Building
Completed
2018
Residential
All-Concrete
117 m / 384 ft
36
3
392
515
4
41,811 m² / 450,050 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Retrofit Start
Retrofit End
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
30 October 2017
Guy Lake, Katie Rathbone, Philip Vivian & Kristen Whittle, Bates Smart
With nearly 90% of its population expected to live in its state-capital cities by 2053, Australia is on track to become one of the world’s...
02 July 2020
Opal Tower residents have filed legal proceedings against the NSW state government to fix the “cracks of the building industry” after finding 500 new defects....
02 July 2020
Opal Tower residents have filed legal proceedings against the NSW state government to fix the “cracks of the building industry” after finding 500 new defects....
19 December 2019
Opal Tower builder Icon has cleared residents to return to the Sydney apartment building, which was evacuated 12 months ago after cracking was discovered in...
29 August 2019
Since the evacuation of Opal Tower at Sydney’s Olympic Park, Construction giant ICON claims it has spent AU$24 million (US$16.2 million), despite putting only AU$1...
01 March 2019
The Opal Tower final report, made public on March 1, 2019 after a two-month investigation, found that critical hob beams in the residential tower were...
02 January 2019
The developer of a Sydney high-rise building which had to be evacuated on Christmas Eve says it has been “stunned” by structural defects which have...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy