This project was renovated in 2017 and replaced by Zeitz MOCAA
You must be a CTBUH Member to view this resource.
South African Railways & Harbours Grain Silo
Building
Completed
1924
Industrial
All-Concrete
58 m / 190 ft
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy