Note: As this project is structurally topped out, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
Uptown Tower
DUT Phase 1 A/ Burj 2020, Burj 2020 Phase 1A, SO/ Uptown Dubai, Uptown Dubai Tower 2
Building
Structurally Topped Out
2022
residential / hotel / office
concrete
LEED Gold targeted
340.0 m / 1,115 ft
78
229
188
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
03 February 2022
Dubai Supertall Set for Completion in Late 2022
Dubai Multi Commodities Centre (DMCC) has announced that the centerpiece of its Uptown Dubai District has topped out at 329 meters. The final concrete pour...
03 February 2022
Dubai Supertall Set for Completion in Late 2022
Dubai Multi Commodities Centre (DMCC) has announced that the centerpiece of its Uptown Dubai District has topped out at 329 meters. The final concrete pour...
09 December 2020
Uptown Tower in Dubai Surpasses 150 Meters
DMCC – the world’s flagship Free Zone and Government of Dubai Authority on commodities trade and enterprise – has announced that the first phase of...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy