CTBUH Gold Member

Mulia Group

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

The Exchange 106

445.5 m / 1,462 ft

2

Wisma Mulia

195 m / 640 ft

3

Taman Anggrek I

151 m / 495 ft

4

Taman Anggrek II

151 m / 495 ft

5

Taman Anggrek III

151 m / 495 ft

6

Taman Anggrek IV

151 m / 495 ft

7

Taman Anggrek V

151 m / 495 ft

8

Taman Anggrek VI

151 m / 495 ft

9

Taman Anggrek VII

151 m / 495 ft

10

Taman Anggrek VIII

151 m / 495 ft

Building Completions Timeline

 

Research

20 March 2020

The Tallest 20 in 2020: Then and Now

This research paper undertakes a review of the 2012 report by the Council on Tall Buildings and Urban Habitat, “Tallest 20 in 2020: Entering the...

Global News

23 October 2019

New Kuala Lumpur Skyscraper Set to Open After Government Scrutiny

Malaysia’s next supertall building will be ready to take in tenants in December 2019, its developer said on October 23, 2019, as backers look to...

Global News

23 August 2019

Tower M, a 145-Story Skyscraper, is Planned for Kuala Lumpur

The Petronas Twin Towers, may lose its title as Malaysia’s tallest building(s), when The Exchange 106 and Menara PNB 118 are completed in Kuala Lumpur....

Statistics

150 m+ Buildings

300 m+ Buildings

Average Building Age*

21 Years

Most Common Function*

Residential (57%), 8 Buildings

Most Common Material*

Concrete (73%), 8 Buildings

* Based on 150 m+ buildings currently in the database.

Total: 14 Buildings for which a function has been assigned.
 
Total: 11 Buildings for which a material has been assigned.
 

*Based on 14 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.