Member Since: 2011
Member Offices: Toronto
WZMH Architects is an award-winning international architectural partnership based in Toronto, Ontario. WZMH believes in a collaborative approach to all assignments, with all project participants working closely together in order to achieve a common goal: the delivery of the project to meet or exceed the expectations of the client.
The firm’s expertise encompasses all aspects of the architectural process, from master planning, site evaluation and feasibility studies, through the design and construction documentation phases, to the final selection of finishes and fittings for building interiors.
WZMH Architects recognize that the final built form must achieve a balance between the practical and the aesthetic: that good design goes beyond superficial appearance and informs all aspects of achieving a built solution that is tailored to the intended use.
Architecture; Interior Design; Urban Design
Membership Level
Contributor
Member Since
2011
Member Offices
Toronto
Rank |
Name |
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Never Completed Proposed Vision Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Completion |
Height |
---|---|---|---|---|
1 |
1976 |
553.3 m / 1,815 ft |
||
2 |
1988 |
275 m / 902 ft |
||
3 |
2012 |
268 m / 879 ft |
||
4 |
2013 |
233.2 m / 765 ft |
||
5 |
1984 |
215.2 m / 706 ft |
||
6 |
2010 |
214.7 m / 704 ft |
||
7 |
2016 |
201 m / 659 ft |
||
8 |
2016 |
201 m / 659 ft |
||
9 |
1983 |
199.7 m / 655 ft |
||
10 |
1999 |
196 m / 643 ft |
Developers of a Ramsey County project hoping to place high-rises and public recreational space along a large swath of St. Paul’s downtown riverfront presented a...
South of Don Mills subway station and Fairview Mall, the Parkway Forest community in the Toronto borough of North York has undergone a major change...
When speculation began in 2019 that the land on the northeast corner of Adelaide and Duncan Streets in the Entertainment District was potentially slated for...
Peter Dickinson Associates (1961)
The Webb Zerafa Menkes Housden Partnership (2002)
150 m+ Buildings
300 m+ Buildings
Average Building Age*
29 Years
Most Common Function*
Office, 45 Buildings
Most Common Material*
Concrete, 36 Buildings
* Based on 150 m+ buildings currently in the database.
*Based on 85 Completed & Under Construction Buildings
NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.
NOTE: Gross-to-Net Height is defined as architectural height minus height of highest occupied floor. Therefore, the Gross-to-Net Height is only calculated for buildings that have both the architectural height and the highest occupied floor height recorded.
Create your own charts using the Explore Data tool.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy