CTBUH Silver Member

BG&E

About

Member Since: 2008

Member Offices: Sydney

Website: http://www.bgeeng.com/

BG&E was formed in Perth, Western Australia, in 1970. They have grown substantially since then to become a strong team of consulting engineers, specializing in the fields of building structures, facades, bridgeworks, civil engineering and infrastructure.

BG&E has established an international reputation for technical and engineering excellence, combined with an innovative, yet cost effective and practical approach to projects. These methods have been recognized by numerous awards.

Maintaining the satisfaction and support of their clients is an extremely important facet of their business. The number of long term client relationships they maintain is a testament to the success of this objective.

Fields of Expertise

Civil Engineering; Engineering, Other; Structural Engineering; Transportation / Urban Infrastructure

Membership details

Membership Level

Silver

Member Since

2008

Member Offices

  • Sydney

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

JW Marriott Marquis Hotel Dubai Tower 1

355.4 m / 1,166 ft

2

JW Marriott Marquis Hotel Dubai Tower 2

355.4 m / 1,166 ft

3

Emirates Tower One

354.6 m / 1,163 ft

4

The Index

326 m / 1,070 ft

5

City of Lights C1 Tower

282.1 m / 926 ft

6

Aurora Melbourne Central

270.5 m / 887 ft

7

Vision Tower

260 m / 853 ft

8

Prima Pearl Apartments

254 m / 833 ft

9

Central Park Tower

252.9 m / 830 ft

10

The Tower

242.6 m / 796 ft

Building Completions Timeline

 

Videos

29 October 2017

Interview: Frank Cerra

Frank Cerra of BG&E is interviewed by Chris Bentley during the 2017 CTBUH Australia Conference.

Global News

27 January 2021

Belgrade Tower Set to Be Completed Within 2021

The President of Serbia, Aleksandar Vučić, visited the construction site of the Belgrade Waterfront. The construction site tour was also attended by the Minister of...

Global News

20 May 2020

Two-Tower Complex Tops Out at Sydney Olympic Park

Mirvac has topped out its AUD$460 million (US$303 million) mixed-use Pavilions development in Sydney's Olympic Park in the same week as the ASX-listed developer won...

Statistics

150 m+ Buildings

300 m+ Buildings

Average Building Age*

9 Years

Most Common Function*

Residential (59%), 48 Buildings

Most Common Material*

Concrete (95%), 69 Buildings

* Based on 150 m+ buildings currently in the database.

Total: 81 Buildings for which a function has been assigned.
 
Total: 73 Buildings for which a material has been assigned.
 

*Based on 81 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.