Switzerland

Europe

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

See all status definitions

Height

1

Roche Turm Bau 3

221 m

725 ft

2

Roche Turm Bau 2

205 m

673 ft

3

Roche Turm Bau 1

178 m

584 ft

4

Nordspitze Tower 1

160 m

525 ft

5

Project Ensemble Tower 1

137 m

449 ft

6

Project Ensemble Tower 2

137 m

449 ft

7

Nordspitze Tower 2

135 m

443 ft

8

Nordspitze Tower 3

135 m

443 ft

9

Prime Tower

125.6 m

412 ft

10

La Tour des Cedres

117 m

384 ft

11

Basler Messeturm

105 m

344 ft

12

BäreTower

101 m

331 ft

13

Praille-Acacias-Vernet Tower 1

100 m

328 ft

14

Wintower

99 m

325 ft

15

Taoua Tower

92 m

302 ft

16

Hardau Hochhaus I

91.9 m

302 ft

17

Cite du Lignon Large Tower

90.8 m

298 ft

18

Sunrise Tower

90 m

295 ft

19

Swisscom Tower

90 m

295 ft

20

Swissotel Zurich

85 m

279 ft

21

Tilia Tower

85 m

279 ft

22

Meret Oppenheim Hochhaus

85 m

279 ft

23

Ceres Tower

81.3 m

267 ft

24

Mobimo Tower

81 m

266 ft

25

Projekt Pi

80 m

262 ft

26

Andreas Turm

80 m

262 ft

27

Franklinturm

80 m

262 ft

28

Tour D`Ivoire

79 m

259 ft

29

Cite du Lignon Small Tower

77.7 m

255 ft

30

Hardau Hochhaus IV

72 m

236 ft

31

Allianz Headquarters

72 m

236 ft

32

AQUILA

66 m

217 ft

33

Escher Terrace High-Rise Apartments

60 m

197 ft

34

Abro

60 m

197 ft

35

Praille-Acacias-Vernet Tower 2

60 m

197 ft

36

Praille-Acacias-Vernet Tower 3

60 m

197 ft

37

Praille-Acacias-Vernet Tower 4

60 m

197 ft

38

Suurstoffi 22

36 m

118 ft

39

Haus C

30 m

98 ft

40

Garden Tower

- m

- ft

Statistics

150 m+ Buildings

Average Building Age*

6 Years

Most Common Function*

Office (100%)

Most Common Material*

Concrete (100%)

* Based on 150 m+ buildings currently in the database.

Total: 2 Buildings for which a function has been assigned.
 
Total: 2 Buildings for which a material has been assigned.
 

Based on 2 Buildings Over 150 m Height

Building Completions Timeline

* Based on 150 m+ buildings currently in the database.

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.