50 Hudson Yards
2 Hudson Boulevard
Building
Completed
2022
Office
Concrete-Steel Composite
LEED Gold Targeted
299 m / 981 ft
58
37
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
2023 CTBUH Awards
22 October 2015
Jay Cross, Hudson Yards
Hudson Yards is the largest private real estate development ever undertaken in the United States. The site, built over a working rail yard, will eventually...
25 October 2022
Foster + Partners has completed 50 Hudson Yards in New York City as part of the Hudson Yards major development in Midtown Manhattan. The 981-foot-tall (299...
25 October 2022
Foster + Partners has completed 50 Hudson Yards in New York City as part of the Hudson Yards major development in Midtown Manhattan. The 981-foot-tall (299...
19 February 2021
50 Hudson Yards, the practice’s latest building in New York has officially topped out. The LEED Gold-designed, 58-story office development forms an integral part of...
15 March 2019
At noon on March 15, 2019, New York’s newest neighborhood ceremonially opened for business. Hudson Yards‘ first public-facing attractions, the Shops & Restaurants and Thomas...
28 October 2015
CTBUH 2015 delegates toured High Line, which have significantly changed the urban landscape of New York City, from its history to its near-future.
28 October 2015
CTBUH 2015 delegates toured the Hudson Yards develoment which is the largest private real estate development in the history of the United States.
27 October 2015
The Hudson Yards Networking Reception took place on Tuesday evening in the incredible Time Warner Center, offering great views of Columbus Circle at the corner of Central Park.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy