Note: As this project is architecturally topped out, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
Three Sixty West Tower B
Worli Mixed Use Development Tower B, Oberoi Oasis Residential Tower, Oberoi Oasis Tower B, Skylark Tower
Building
Architecturally Topped Out
2024
Residential
All-Concrete
260 m / 853 ft
66
4
280,319 m² / 3,017,329 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
13 October 2016 - CTBUH Research
As part of the larger Three Sixty West mixed-use development, Three Sixty West Tower B is located in the Worli district of Mumbai, north of the central business district. The site, lying just 600 meters east of the Arabian Sea, is contextualized around the nearby water. As most of the surrounding buildings are low-rise, the tower’s western facing sightlines are maximized to offer views of the sea.
The visual connection to water was an integral consideration to the development of the building, and is brought to life on the site and in the tower through the addition of water features in public spaces, recreation zones, and even private residences. Nowhere is this theme more apparent than the building’s pool. Facing out from the north façade of the 6th floor, the pool is located in a double-height space and provides one of the widest views of the surrounding area. Its location in the building establishes a direct dialogue with the sea; while the pool itself ends well before the floor’s precipice, a shallow sheet of water extends all the way to the edge of the façade and disappears in an infinity edge meeting the sea beyond.
Along with its proximity to the water, the building’s design is informed by the concept of interconnectivity. On the building’s exterior, the curtain wall was inspired by the idea of a woven fabric. Staggered and segmented vertical metal fins are arranged along the exterior. This pattern is manipulated based on the function of the space within to provide varying degrees of transparency. These elements create a woven motif that unifies the whole complex and integrates it into the city’s cultural context.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy