Filter by
Member Since: 2015
Member Offices: London
Zaha Hadid Architects work at all scales and in all sectors. They create transofrmative cultural, corporate, residential and other spaces that work in synchronicity with their surroundings. Each of Zaha Hadid's, founding partner of Zaha Hadid Architects, dynamic and innovative projects builds on over thirty years of revolutionary experimentation and research in the interrelated fields of urbanism, architecture, and design.
Architecture; Interior Design; Urban Design
Membership Level
Gold
Member Since
2015
Member Offices
London
Rank |
Name |
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Never Completed Proposed Vision Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Height |
---|---|---|---|
1 |
Jumeirah Nanjing Hotel & International Youth Cultural Centre Tower 2 |
315 m / 1,033 ft |
|
2 |
Jumeirah Nanjing Hotel & International Youth Cultural Centre Tower 1 |
255 m / 837 ft |
|
3 |
213.1 m / 699 ft |
||
4 |
207 m / 679 ft |
||
5 |
200 m / 656 ft |
||
6 |
190 m / 623 ft |
||
7 |
188 m / 617 ft |
||
8 |
177.4 m / 582 ft |
||
9 |
170 m / 558 ft |
||
10 |
153.7 m / 504 ft |
CTBUH Chapter Board Member, 2018 – Present
CTBUH Awards Façade Engineering Jury, 2019
CTBUH Annual Conference, Keynote Speaker, 2006
The Morpheus Hotel is within the City of Dreams resort of Macau, which includes a casino, two theaters, a shopping district, 20 restaurants and four...
Recently, there has been a growing and overdue recognition in the architecture discipline that women are under-represented, not just in terms of leadership positions held,...
Straddling the new subway tunnel that diagonally divides its site, the Leeza SOHO tower in Beijing rises as a single volume divided into two halves...
150 m+ Buildings
300 m+ Buildings
Average Building Age*
6 Years
Most Common Function*
Residential, 13 Buildings
Most Common Material*
Concrete, 16 Buildings
* Based on 150 m+ buildings currently in the database.
*Based on 55 Completed & Under Construction Buildings
NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.
NOTE: Gross-to-Net Height is defined as architectural height minus height of highest occupied floor. Therefore, the Gross-to-Net Height is only calculated for buildings that have both the architectural height and the highest occupied floor height recorded.
Create your own charts using the Explore Data tool.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy