CTBUH Silver Member

Cosentini Associates

About

Member Since: 2011

Member Offices: New York City

Cosentini Associates was established in 1952 to provide consulting services in the mechanical and electrical engineering disciplines. They believe that every building is an investment and are committed to assuring a return on that investment, both in the short term and over the life of the building.

The firm’s design services include HVAC, electrical power, fire protection and engineering, plumbing, telecommunications, security, audiovisual, specialty lighting, LEED/sustainable design, LEED facilitation, mission-critical design, commissioning, construction services, and code consulting.

Their firm’s unparalleled combination of engineering expertise and innovation has led architects and owners throughout the world to entrust them with many of the greatest buildings of our time.

Fields of Expertise

Computers / IT / Software; Environmental Engineering; Fire Engineering; Mechanical, Electrical & Plumbing

Membership details

Membership Level

Contributor

Member Since

2011

Member Offices

  • New York City

Buildings

Rank
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Never Completed

Proposed

Vision

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height

1

Jeddah Tower

1000 m / 3,281 ft

2

Shanghai Tower

632 m / 2,073 ft

3

Mercury City Tower

338.8 m / 1,112 ft

4

The Spiral

317.3 m / 1,041 ft

5

Eurasia Tower

308.9 m / 1,013 ft

6

Doosan Haeundae We've the Zenith Tower A

300 m / 984 ft

7

220 Central Park South

289.6 m / 950 ft

8

Three International Finance Center

284 m / 932 ft

9

Doosan Haeundae We've the Zenith Tower B

281.5 m / 924 ft

10

Doosan Haeundae We've the Zenith Tower C

265 m / 869 ft

Awards

ARO

Award of Excellence: ARO

Best Tall Building 200-299 meters 2021

Ctbuh Leaders

Douglas Mass

Douglas Mass

CTBUH Awards Technical Jury, 2014

New York City

Bud Spiewak

Bud Spiewak

CTBUH Awards MEP Engineering Jury, 2020

Chicago

Building Completions Timeline

 

Research

01 June 2013

Meeting the Energy Reduction Goal on a High Rise Building thru IPD Framework

Greenhouse gas emissions and excessive energy consumption have been an on-going world issue nowadays. We can find that the majority portion is caused by high-rise...

Global News

13 August 2019

Glass-Clad Mixed-Use Tower to Replace Old Brick Building in Chicago

Just weeks after securing a zoning change from city officials, developer Sterling Bay is moving forward with its plans to demolish an older building on...

Global News

07 June 2019

Scalloped Condominium Tower Tops Out in Brooklyn, New York City

The Studio Gang-designed 11 Hoyt has topped out in Brooklyn to its full height of 626 feet (191 meters), offering 481 luxury residential condominiums, with...

Statistics

150 m+ Buildings

300 m+ Buildings

Average Building Age*

15 Years

Most Common Function*

Residential, 94 Buildings

Most Common Material*

Concrete, 115 Buildings

* Based on 150 m+ buildings currently in the database.

 
 

*Based on 190 Completed & Under Construction Buildings

Building Completions Timeline

 

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.

 

Gross-to-Net Height

NOTE: Gross-to-Net Height is defined as architectural height minus height of highest occupied floor. Therefore, the Gross-to-Net Height is only calculated for buildings that have both the architectural height and the highest occupied floor height recorded.